Client: Stublach
Project: Stublach Gas storage:
Pump House Phase
Solution: The pump house then extracts the brine water solution and the gas can then be stored in the remaining cavity. Once extracted the solution is then diverted to the degassing tank where the salt and the water are separated allowing the water to be used again.
Grovemoor worked on this project between April 2008 and March 2009 employing anywhere between seven and twenty nine employees at any given time. This team included a number of shuttering joiners, concrete specialist and steel fixers. Each part of this project required specific shuttering to be constructed, allowing for the perfect concrete finish to ensure complete customer satisfaction.